Post Falls, Idaho · 24/7 emergency dispatch
Call (208) 679-8357
Freestanding bathtub with a chrome tub filler faucet beside a navy wall
Home / Blog / Plumb a shower valve

How to Plumb a Shower Valve in Post Falls, ID

A shower valve is the heart of a bathroom remodel, and it is the part you cannot easily change once the walls are tiled. The valve body goes in during rough-in, and every measurement from the height of the valve to the depth in the wall matters. This guide explains how a shower valve is plumbed and where the mistakes happen.

Need a plumber now?
(208) 679-8357
☎ Call now

Understand the parts

A shower valve has a body that sits inside the wall, a cartridge that controls flow and temperature, and a trim kit that covers it on the finished side. The hot and cold supply lines connect to the body, and a line leaves it for the showerhead and, in some designs, the tub spout. Most modern valves are pressure balancing or thermostatic, which help prevent scalding when someone flushes a toilet or runs a sink.

The valve body and trim must come from the same brand and series, because the cartridge depth and trim fit are specific. Buy both before you rough in, and keep the manufacturer's rough-in instructions with you.

Planning the rough-in

Rough-in happens with the wall studs open. Decide where the showerhead, valve and tub spout will sit, then mark the valve height on the studs. A common height is about 48 inches from the floor to the valve center, though comfort and the manufacturer's range both matter.

Set the valve depth so the face of the body sits at the right distance from the finished wall. Too deep, and the trim will not reach. Too shallow, and it will not seat flat. Most bodies come with a plaster guard or depth gauge that shows the correct range, and the finished wall thickness, whether tile over backer board or a surround, changes the number.

Typical steps for a new valve

This is the order a plumber follows when the wall is open.

  • Shut off the water and drain the lines that will be cut or extended.
  • Frame a blocking board so the valve body is held firmly.
  • Connect hot to the left and cold to the right, as the manufacturer specifies.
  • Run the supply to the showerhead arm and the tub spout, with firm support at each elbow.
  • Pressure test the new lines before the wall is closed.
  • Install the plaster guard and keep it in place until tile work is done.

Joint types and where they fit

The method for connecting pipes depends on the material and the code.

MethodUsed withNotes
Soldered copperCopper supply linesNeeds a torch and a fire safe workspace
Crimped or clamped PEXPEX supply linesNeeds the right ring tool and fittings
Push-to-connect fittingsCopper, CPVC and PEXQuick, but not every inspector accepts them in a wall
Threaded connectionsValve outlets and trimUse tape or dope rated for potable water

Common mistakes at rough-in

Reversed hot and cold supplies are surprisingly common, and the result is a shower that runs cold when you turn it hot. Check the valve body markings against the plan before you connect. A valve set too deep or not square in the wall will leave the trim crooked or unattached.

A loose valve body is another problem. Without solid blocking, the valve will wobble every time someone turns the handle, and in time, the joints will loosen. Pressure test the lines for at least fifteen minutes before the wall is closed, because a leak found after tile goes up is a major repair.

Permits for bathroom work in Post Falls

Moving or adding plumbing fixtures usually calls for a permit, and the City of Post Falls Building Division handles it at 408 N Spokane Street. The phone number is (208) 773-8708. Inspections happen at rough-in, before the walls close, and again at final. Ask which inspections your project needs and schedule the rough-in inspection before you hang drywall.

The work follows the 2017 Idaho State Plumbing Code. The Uniform Plumbing Code (UPC) calls for anti-scald protection in showers, which is why pressure balancing and thermostatic valves are standard, and ASSE 1016 is the standard those valves are tested to. Remodeling in the lake city instead? See how we work at our Coeur d'Alene page, since that city handles its own permits.

Pressure balancing and thermostatic valves

A pressure balancing valve reacts to sudden changes in pressure on the hot or cold line, and it limits swings in temperature. A thermostatic valve holds a set temperature and lets you control volume separately. Both help prevent scalding, and many codes require one of them in a new shower.

Thermostatic valves cost more and often need a larger body or a separate volume control. Balancing valves are simpler and cheaper. Think about who uses the shower. A household with children or older adults may value the steadier temperature of a thermostatic valve, and the extra cost is usually small next to the cost of the tile around it.

Planning a bathroom remodel?

Call us. We handle rough-in, permits and coordination with other trades.

☎ Call (208) 679-8357

When to hire a plumber

A valve swap in an existing wall, with the same body and a new trim, is within reach of many homeowners. A new valve in an open wall is a different job, because the rough-in decisions are permanent. If you are moving the valve, adding a second showerhead or changing from a tub to a shower, a plumber's experience saves rework.

Our plumbing installation page explains how we plan remodels, from the first fixture layout to the final inspection. If you are also replacing the water heater or the supply lines as part of the project, our repiping page explains when the supply pipes deserve replacement.

Testing before you close the wall

Once the lines are connected, turn the water on and check every joint. Look for drips on the valve body, the elbows and the supply stubs. Run hot and cold through the valve, and confirm the handle turns the right way.

Leave the pressure test in place while the inspector visits, if the inspection is scheduled. Then fix any leaks, close the wall and complete the finish work. If you are in Coeur d'Alene, our Coeur d'Alene page explains how we serve homeowners there.

Shower valve questions from Post Falls homeowners

A common height is about 48 inches from the floor to the valve center. Comfort and the manufacturer's recommendation both matter.

Replacing a trim kit usually does not. Changing the valve body or moving fixtures often does. Call the Building Division at (208) 773-8708 to confirm.

Generally no. The cartridge and trim are specific to each series, so buy them together.

Hot and cold supplies may be reversed, or the cartridge may be installed backward. A plumber can check it.

It helps. An access panel on the back side of the wall lets you service the valve without breaking tile.

Our coverage area across North Idaho

Dispatch runs from Post Falls along I-90 and State Highway 41 into Coeur d'Alene, Rathdrum and Hayden.

☎ Call now: (208) 679-8357 · 24/7 ☎